A blog dealing with Sarasota County and the City of Sarasota.

Sunday, June 22, 2014

Saving the Palms of Palm Avenue


I am on a quest. A quest to find out what the City of Sarasota (as represented by the Downtown Development District) thinks twenty-six cabbage palms are doing wrong.


The Palm Avenue Twenty Six


The palms (ironically?, tragically?) are on Palm Avenue between Coconut and Main. This end of Palm is referred to as North Palm (shortened ominously to NPALM in City-speak), but this is the part of Palm that is turning almost due west.


The Bay Plaza building in the center of the image wraps around the site in question
In the image below you can clearly see the dense, spherical palm canopies (and the dense shade they produce).


Compare the dense shade produced on the south side of the street with the plantings on the north side.


I don’t think there is much question that the two most engaging streets in downtown Sarasota are Main Street and Palm Avenue. Thousands of towns have Main streets, but Palm avenues are far rarer those who find themselves on a Palm Avenue anywhere deserve to be rewarded with a palmy experience that affirms the subtropical potential promised by the name.

There are many palms on our Palm Avenue between Coconut and Ringling and they represent many species. Intriguingly, the densest aggregation of palms are found on this short (150 foot-long) block. These palms are not solitary specimen trees in planters or emerging from the sidewalk, but rather a collection of 26 palms emerging from a lawn – sort of a micro-park.

We know it is parklike because there is even a sign advising people to clean up after their pets. It is the only area along Palm Ave. between Coconut and Ringling where there is a non-trivial patch of grass – grass that the adjacent merchants and not the City maintain.

The presence of this sign recognizes the de facto status as an unofficial "micro-park".
The palms happen to be our State tree, the native cabbage palm. A professional arborist recently described these 26 trees as exhibiting “good vitality and no signs or symptoms infection”. The trees are low maintenance and, being planted so close together, they produce deep shade. The area is extremely pedestrian friendly – people can, and do, walk through the palms on the grass, or use stepping stones. The narrow palm trunks afford great views of the businesses adjacent to the sidewalk.

These are the 26 palms the City of Sarasota wants to take down and send to the landfill and replace with two hollies, eight (freeze sensitive) thatch palms, two Tabebuias and two poisonous shrubs.

Let me repeat: replacing 26 mature shade producing trees with two hollies, two tabebuias, eight small palms, and two poisonous shrubs. The ground cover will either be paved or covered with “groundcovers or pine bark mulch” that will convert the open access, pedestrian friendly area into hardscape and planter beds that signal “keep out”.




This represents approximately 35% of a $240,000 project, so somewhere around $85,000 to $100, 000 to rip out a steadfast, low maintenance landscape and replace it with something new and presumably trendier.

I know what you are thinking. Why? Why would the city spend somewhere around a hundred grand to repudiate trees that have been quietly doing the city’s bidding for decades? That's my question as well.

The Palm Avenue Twenty-Six are planted in front of a single story building that was built in 1954. I'm still trying to find out when the palms were placed there, but I suspect they have been there for many decades. These may actually be trees with historic import.



I've been told (in emails) that the goals of the city were widening the sidewalks, upgrading the landscaping, “undergrounding” of utilities, and adding ornamental street lighting. I understand there was also a drainage or flooding issue that needed to be addressed. If, in fact, those were the five actual front-end goals of the project I am confused because I suspect virtually all of those goals could be achieved in that location without removing any of the palms.  

The City has scheduled a site visit on July 1 when I hope to get to the bottom of why every single one of these trees is slated to disappear. My fear/suspicion is that instead of starting with the existing landscape and modifying it to reach their goals, they started by assuming all the palms would vanish and they could start with a clean slate.


View from the parking garage across the street

As mentioned earlier, this is a project of the Downtown Improvement District (DID),  creature of the Sarasota  City Commission. 

I was speechless to see that their website features a photo of Charleston, a City whose landscaping hallmark consists primarily of cabbage palms (known in South Carolina as palmettos). More irony. Any group intending to improve Charleston would be run out of town on a rail if they proposed removing more than two dozen palmettos.


Actual image from DID website, ostensibly representing their admiration of the use of cabbage palms in Charleston

If you happen to know any of the five directors of the DID


Ernest Ritz

Mark Kauffman

Eileen Hampshire

Thomas Mannausa

Ron Soto

Please contact them and encourage them to reconsider this unfortunate proposal that will trigger an outpouring of outrage from citizens who are currently unaware of the threat.











Tuesday, November 12, 2013

Lido Beach: "Critically Eroded"?

No doubt about it. There are some places on Lido Beach that could use some more sand. There's a scarp near that groin in the center of the island (below), and then there's those two buildings near the south end that project much further west than their neighbors are dealing with a pretty minimal beach.

Erosion scarp next to groin. Lido Beach.


These two buildings were probably built too far seaward.

But overall, is Lido Beach in bad shape? Based on a recent walk, I'd say no (see photo below), but the State of Florida Department of Environmental Regulation begs to differ.

Image from the center of Lido Key. Many places in the US would love to have a beach like this.

In June of 2012, not that long ago, DEP updated their publication CRITICALLY ERODED BEACHES IN FLORIDA. I'm assuming the term "updated" meant that it was up to date.

Here's their definition of critically eroded: Critically eroded area is a segment of the shoreline where natural processes or human activity have caused or contributed to erosion and recession of the beach or dune system to such a degree that upland development, recreational interests, wildlife habitat, or important cultural resources are threatened or lost. Critically eroded areas may also include peripheral segments or gaps between identified critically eroded areas which, although they may be stable or slightly erosional now, their inclusion is necessary for continuity of management of the coastal system or for the design integrity of adjacent beach management projects.

So according to DEP 23.9 miles of Sarasota County Gulf beaches are critically eroded. And .4 miles are non-critically eroded. So 98.35% of our beaches are critically eroded. Ninety-eight point thirty-five percent. Kind of takes some of the meaning out of the term doesn't it?

In other words, according the the State of Florida, a beach does not have to be critically eroded, or even eroded, to be deemed critically eroded. It could be growing. And that's reassuring, because they were characterizing North Lido as critically eroded.

Here's what the report says about North Lido: The north end of Lido Key fronting on New Pass is a critically eroded inlet shoreline area (R31, east 1500 feet) for 0.3 mile. Nearly all of Lido Key (R31-R44.5) has critically eroded beach that has threatened private development and recreational interests along 2.4 miles. Beach restoration has been conducted along the island and maintenance dredging material has been obtained from the federal navigation channel at New Pass.

Which is interesting because North Lido, out at the end of John RIngling Blvd. is wider now than I can remember it being in 43 years. I would say it was critically eroded when waves lapped at the rocks north of the parking area. But now you could rent camels to get people out to the water since it is about 650' from the parking lot to the Gulf shore.

This image from January of 2012 presumably represents the "eroded" condition of North Lido reported in the DEP document.

So when you read that Lido Beach is "critically eroded", take it with a grain of salt. Or sand.

Monday, November 4, 2013

Ten More Questions about the Corps' "Hole in the Shoal" Proposal

I may have been a little hasty in assuming there were only ten top questions about this project. Here are ten more that need to be asked (and answered):

11. Has the City of Sarasota or the Corps of Engineers been cooperating and collaborating with Sarasota County on this project? If so, how, when, and to what extent?

12. Have there ever been any hearings on this project? (We are unaware of any County or City hearings. Did the Corps ever hold hearings?) Implicit in this question is whether any fifty-year multi-million dollar contract should be entered into by the City without public hearings. 

13. There has been recent contention between the City and County regarding jurisdiction over new dredging projects within the City. This was believed to only affect a proposed navigation channel at the end of 45th Street. It is now clear the resolution could affect this project. What is the status of this jurisdictional dispute? 

14.What are the exact City and County boundaries in the vicinity of Big Pass and out into the Gulf?

15. Has this project subverted or derailed the previous pattern of alternating sharing of New Pass sand between Lido and Longboat beaches? 

16. How does the Sarasota County Comprehensive Plan address dredging in previously undredged locales and adding hardening structures to beaches? Does the County Plan apply in municipalities?

17. Does South Lido Park have any covenants or management plan restrictions that would affect the placement of groins?

18. How do we reconcile the discrepancy between the recommended locations in the Corps proposal, which differs from the County's adopted Inlet Management Plan?

19. The state beach management plan mentions "offshore sources". How can the Corps claim their proposal is congruent with the state plan if it would be taking sand from the ebb tidal shoal and not offshore? 

20. Does the model the Corps is using predict the existence and movement of Sand Dollar Island, which is important both recreationally and for wildlife? If not, why not? 

Sunday, October 27, 2013

The Image that Inspired Jono's "Hole in the Shoal" Column


The Sarasota Herald Tribune was kind enough to run my guest column on October 27th, but it did not run with the Google Earth image that inspired the piece. reproduced below is my column with the Google Earth image. 

-------------------

Watching the suspenseful lost-in-space movie, Gravity, I felt guilty at times -- abandoning the tense plot to stare at our wondrous planet. With borders erased and most human works minimized, it's so very easy to appreciate the sublime character of Earth. That got me wondering about what natural phenomena in Sarasota look spectacular from space, so I fired my laptop spaceship, Google Earth, and gazed down at Florida.  

The Gulf shoreline and darker “Myakka Island” area make Sarasota County easy to find. But being recognizable is not the same as being beautiful. I love the two Myakka lakes, but from space they are dark, potato-shaped blobs. Our beaches, which are so dramatic on the ground, are mostly fine white lines from space. The only naturally gorgeous natural phenomena I see are the two luminous, sinuous tongues of sand to the north and south of Lido Key. These are the so-called ebb tidal shoals of New Pass and Big Pass – glowing pale green flames flickering in a blue sea.
 



The Big Pass shoal is particularly striking. Two miles long, it departs from South Lido Park starting out wide and then turns and narrows in a reverse S curve, sheltering the north end of Siesta Key. Our other passes have been straitjacketed or bridged, but Big Pass remains wild and powerful  -- the juxtaposition of massive quantities of water and sand reshaping each other in a daily dance -- a place where the raw power of the Gulf can still be easily appreciated. Boaters and bathers need to be attentive and respectful.

These shoals are the result of two forces in dynamic tension. As the result of currents and winds, sand is generally moving from north to south along the Gulf shore. Meanwhile tides are surging in and out of the passes. The inhalation and exhalation of the bays sucks some sand into flood tidal shoals, and blows other sand out to ebb tidal shoals. Despite these distortions in flow, the sand keeps moving and the north-to-south trend is evident in the southward-bending shape of the shoals. While some of the sand lingers in the shoals, other sand continues on – so, metaphorically, some of Lido’s sand today was Longboat’s yesterday, and will be Siesta’s tomorrow.

The shallow shoals dissipate wave energy, which is why we see waves breaking on them. So in addition to passing some sand along to the next island, they shelter the shore in their lee, creating calmer areas that can lead to the accumulation of sand. In the passes this sheltering effect is contradicted by the force of water flowing in and out, but as the tidal flow is distributed, the wave shadow effect becomes more noticeable. So the shoals are doing at least three things: passing sand along, dissipating wave energy (sheltering areas of the shore), and thereby allowing for sand accumulation.

The competing forces that shape the shoals are so complicated (and so subject to random catastrophic events) that it requires extremely complicated and memory-intensive computer programs to even approximate pass behavior. There are very few people qualified to assess the predictive ability of these computer models. That doesn’t matter when the models are solely academic exercises meant to increase understanding of our barrier islands and passes.

But when people start using such models to make decisions about our beaches, then you want to make sure you understand the risks involved. Right now the City of Sarasota and the Army Corps of Engineers are proposing to remove more than 43 million cubic feet of sand from the Big Pass shoal. That’s going to create a big hole in the shoal. They want to put it on Lido Beach (and add three rock groins). The proponents have concluded, based on computer models, that the only noticeable effect of removing so much sand will be some “minor” increase in wave heights along the Siesta side of the pass.

But their model and conclusions have not been peer-reviewed. Local boaters, elected officials, homeowners, and other citizens do not have the training to assess how reliable these models are, so the only hope of objective interpretation of the risk to the shoal, and consequently the Siesta side of Big Pass, North Siesta Key and Siesta Beach lies in getting qualified experts to weigh in.

Did I mention Siesta Beach could be affected? The dramatically-wide Siesta Beach famed for its fine, blinding-white sand and gentle, family-friendly slope – our most popular park – the beach named the number one beach in the country in 2011.

Anyway, the City and the Corps are not currently planning on any peer-review (or any public hearings) on their hole-in-the-shoal proposal that will cost $23 million dollars and require a 50-year commitment with the Federal government. What could possibly go wrong with a plan like that?

Tuesday, October 22, 2013

Top Ten Questions People Should be asking about the City of Sarasota Proposal to Dredge Big Pass

The City and the U.S. Army Corps of Engineers are very deep into a project that would involve removing sand from the Big Pass ebb tidal shoal and placing it on Lido Key. 

The Big Pass shoal has never been dredged, primarily because of understandable fears of impacting Siesta Key and Siesta Beach.


There are a number of significant unanswered questions. 

1 Where's the peer review?  The County's generic inlet management plan has been peered review but this particular proposal has not. Why not? There are a number of very technical calculations and assumptions involved that only independent experts can fairly assess. (And there's some question that the peer reviews cannot be interpreted as open-ended endorsement of what is being proposed).

2 Where's the public hearing/input? The Corps alludes to public hearings held in either 1999, 2002, or 2004. That's their excuse for not having hearings now. We need to get the records both of those hearings and how they were advertised. 

Beyond that, it is an insult to current citizens to allude to meetings held a decade or more ago as meeting the need for public participation. Not only has Lido Beach changed, but so has our understanding of rising sea level, the ability of the state and federal government to pay for such projects, and even the appropriateness of such roles.

While they are not hearings, there will be additional public meetings 5:00 pm Dec.5 at St. Boniface Church on Siesta Key, 9:30 p.m. Dec. 6 at the Harley Sandscastle and another meeting on Dec. 7th. Don't be taken in, these brief opportunities to speak are NOT public hearings. 

3 Where would the sand that will be filling the hole in the Big Pass shoal have gone without the project? We've known for quite a while that the sand comprising the emergent and submerged portions of our barrier islands is a system and that, because it is a system, adding or subtracting sand anywhere in the system inevitably has other effects. So, conducting a thought experiment, imagine the sand filing the hole created in the shoal. Now ask where that sand might have gone if the hole was not there. If the answer could involve Siesta Key beaches, (or even the shoal that extends offshore of Siesta Key) then you have to conclude the dredging could affect Siesta Key. 




4 How can the project claim to make a big difference for Lido Key and simultaneously make no difference elsewhere? We know the sand comprising the above and below water portions of our barrier islands are a system. The Corps is proposing to excavate 1.3 million cubic yards of sand. A cubic yard is twenty-seven cubic feet. So imagine a box a cubic foot in size and imagine a line of these boxes 35,100,000 boxes long -- if my math is correct -- that is a line of square foot boxes over 6,500 miles long. A lot of sand. And a big hole in the shoal. How can that NOT affect the system?

5 Where's the comprehensive coordinated gulf Shoreline management plan for all of Sarasota County? An adopted inlet management plan is not a Gulf shoreline plan. Allowing the City of Sarasota, Longboat Key, the City of Venice and the County to plan separate approaches to what is one system makes no sense. There are two reasons for this: this first is the interconnectedness of the sand system and the second is explored in 10 below. 

6 How can the Corps of Engineers claim this project is congruent with the state plan when the state plan calls for an offshore send source (and Big Pass is not such a source)? The Corps's representative quoted from a state plan that specifically mentioned "offshore sources". 

7 What are the implications of a 50 year commitment with the federal government? Embarking on this path is a deliberate decision to start an addictive behavior - sand addiction that is supposed to last half a century. I've been told on more than one occasion that commissions should not be binding future commissions. This is the ultimate future bind.

8 How might this project impact Siesta Key, Siesta Beach, and Sand Dollar Island? Put another way: What is the degree of risk  we are willing to accept that Siesta Beach will not be negatively affected? 20% 10% 5%? 

The Corps acknowledges only some "minor" increase in wave heights along Big Pass shorelines. But these reassuring statements are based on some of the most complicated computer models imaginable. That's why professional independent peer review is needed. 

9 Is Lido Key really critically eroded? When was that determination made? The City engineer referred to Lido Key as "fairly eroded". The Corps determined (at some point) that the beach is "critically eroded". Go out and look for yourself.

 Look at the end of John Ringling Causeway at the beach that is more than 600 feet wider that the worst we can remember. Look south of the Pavilion (photo below). And check out the giant plume of sand heading south from New Pass.

South Lido Key gives rise to one of the most dramatic shoals
in all of Southwest Florida.
Click on the image to enlarge.
Is Lido Key "Critically Eroded" as the Corps of Engineers claims?
Click on the image to enlarge.

10 What opportunity costs are associated with moving forward with this particular project? Choosing this project will indirectly and inevitably limit our ability to address other coastal challenges.  

We're talking about a project of only 1.6 miles costing an estimated $22.7 million-- so that would be about $14 million per mile. So approaching all 35 miles of county gulf shoreline in this manner, would cost about $490 million. Add a little inflation or cost overrun and we're talking $500 million. Since that is obviously not viable, moving forward with this project is an implicit choice to work on Lido Key at the expense of other beaches. 

Because of the important role Lido Beach plays in local tourism, that may be entirely appropriate. But the proponents should be frank with the rest of the county and let Longboat Key, South Siesta, Casey Key, Venice, Caspersen and Manasota Key know that this choice may well limit the supply of dollars to address other beach concerns.

While it is true that forgoing this federal money (62.4% of the estimated $22.7 million) will not free up those dollars for other local coastal concerns, it is also true that the federal government, state, and tourist development dollars are not inexhaustible. So while sand-shuffling on Lido is unlikely to affect a locale as far south Venice Beach, dollar-allocating conceivably could.
___________________

Bottom line: The City of Sarasota and the Corps are contemplating using stale decisions and an inadequate public process to initiate a fifty-year relationship with the federal government for a questionable project that  has not been peer reviewed and which involves tampering with a submerged supply of sand that has some not-completely understood relationship with the most valuable beach in the County. 

The Corps and the City are attempting to frame this project in the form of an ultimatum: either accept what we are proposing, or "we will have to go back to square one" and start all over. In other words, don't bother to question, improve, modify or adjust what we have come up with. If you do, the feds are taking their $14 million dollar basketball and going home. In light of the current beach condition, the lack of public participation, the absence of peer review, the failure to have a coherent, coordinated plan for ALL our beaches, and the insights we've gained in the last decade about the full scope of our coastal challenges, that is an option worthy of serious consideration. 


------------------------------

You might also be interested in an earlier post on the subject of the Big Pass Shoal.

Thursday, September 12, 2013

Term Limited Lame Duck Side Effects Coming Home to Roost?

One newspaper column doesn't constitute vindication -- it barely rises to the level of affirmation, but today's (September 12, 2013) Sarasota Herald Tribune features a front page Jeremy Wallace column "Term limits causing ripples" that

"has some critics wondering if commissioners are more willing to curb public records access, reverse restrictive land-use policies and take on the county administrator without the prospect of having to run for election again.
“It doesn’t look like they are looking at the voters as much,” said Lourdes Ramirez, a community activist from Siesta Key who has been considering running for the County Commission herself."


------•-----
On October 6th, 2011, I posted a blog I believe . . . term limits for County Commissioners with the following argument against term limits for Sarasota County Commissioners. I argued term limits would:
3) create guaranteed lame ducks with no second term accountability to an electorate, because once they get elected to a second term they need never consider the electorate again. If they are good commissioners they can vote their conscience, but if they are not so good they can act on behalf of their supporters, further their own interests, or generally thumb their nose at the electorate. ( And the whole premise of term limits seems to be based on the proposition that, if not initially rotten, elected officials soon turn towards the dark side.)

In his column Wallace recounts the curious sequence that led to us having four lame duck commissioners at one time. And that no doubt makes the situation more obvious. But I would argue this pattern was likely to emerge even with 60/40 split instead of 80/20. 

Then in November of 2011 I posted another blog Term Limits: Stifling Competition?, hypothesizing what I called Potential Contender Backoff (PCB) [political scientists probably have a real term for this phenomenon] in which I argued 


". . .instead of fostering challenges, two term limits may inadvertently give people a pass on their second term, functionally creating what amounts to an eight year term -- not a great outcome if candidate X is only a mediocre commissioner."


So, I was, and am, predicting that some of the many ramifications of term limits for Sarasota County Commissioners will be fewer, not more, challenges for first term incumbents as well as second term commissioners less responsive to the electorate. 


I'm not saying that will happen in every case, or even that our current commission's behavior is necessarily the result of term limits. But I continue to believe that letting 26,000 primary voters in 1998 determine who 283,189 registered voters vote for County Commissioners in the Twentifirst century was a dangerous and debilitating mistake. And, if I am correct, there will be no pleasure in finding out.
Bottom line: the combination of PCB and lame duck status is likely to make Sarasota County Commissioners more entrenched and less accountable. We can bemoan that this likely outcome was underanticipated, ignored, or otherwise given short shrift, but it was not, contrary to Jeremy's column, unexpected -- it was predicted. 


--------------------------

N.B. I have a total of seven or eight blog postings dealing with term limits (you can search for them), including a strange posting in which I aligned myself with Dave Waechter - proving not only that I am flexible, but fallible too.

Wednesday, August 7, 2013

Long Bar Pointe and Western Manatee's Mixed-Use Challenge

Well, there's a bunch of us eligible for tee-shirts reading: 

THE LAST TIME I STAYED OUT 
'TIL TWO IN THE MORNING
WAS AT A MANATEE COUNTY 
COMMISSION HEARING. 


My main accomplishment, aside from staying awake, was being one of the last speakers and not repeating or re-phrasing any previous points.*



It is hard not to sympathize with Carlos Beruff when he pleads for "not another boring subdivision". The alternative apparently is Mixed Use, but despite Commissioner Benac's views to the contrary, I don't think this the Long Bar Point parcel is a very strong candidate for mixed use. You really want Mixed Use associated with significant transit, and definitely not in the Coastal High Hazard Area.



Kudos to Commissioners DiSabatino, Chappie, and Gallen for resisting the siren song.



From a development perspective Mr. Beruff and his partner, Larry Lieberman, have a very challenging (I was tempted to say crummy) parcel -- it is low, it is scrawny, most of the uplands have been trashed, and the coast happens to consist of the most significant, most easily impacted, and tallest mangrove section remaining on Sarasota Bay. But it was the last major hunk of undeveloped property on Sarasota Bay, so you can see its appeal. It has probably remained undeveloped for so long because the significant liabilities meant it would take a blend of clout, capital, vision, and hubris to attempt much of anything other than more McMansions. Enter Carlos Beruff. 

[And I have to say the development to the South of Long Bar is a textbook example of how destructive and sterile this development form can be - sorry IMG, but Legends Bay makes the case for Beruff's vision.].

With the Long Bar Pointe parcel that is pinched between El Conquistador Parkway (shortened to ElCon in the vernacular) and the Kitchen (a reliably productive section of Sarasota Bay), Mr. Beruff was hoping to implement a BOLD vision, but that vision was snatched away August 6th when the Manatee County Commission deleted reference to, and the possibility of, a marina in their approval of Mixed Use.


Mr. Beruff was quoted in the Sarasota Herald Tribune as saying the Hotel (5 or 4 star) depended on the marina (boat slips) that would require a channel through the seagrasses. "Without that water access, Beruff says, the destination hotel just is not feasible." Since it is possible the conference center hinged on the hotel, the entire vision may collapse. Or Mr. Beruff may have more strategy to employ.



The key challenge for environmentalists and those seeking to protect the bay, its Kitchen, and the adjoining seagrasses will be protecting the mangroves. Pruning 40 foot mangroves to 6 feet is a recipe for disaster.



But now that Mixed Use has been approved, the solution to Mr, Beruff's problem is simultaneously obvious, elegant, and quite probably impossible. But let's review it anyway.